The site for the new casino was located on a capped landfill. All of the sewer and most of the storm and water were installed in 5 to 15 feet of landfill material, which was hauled to on-site berms. Utilities, structures and headwalls had to be installed on piles and concrete pile caps to counteract primary and secondary settlement. These utilities included:

  • 4,600 LF of Sanitary Sewer Pipe, with 25 Manholes
  • 14,800 LF of Storm Pipe, with 150 Structures
  • 1,800 LF of Telephone Duct Bank
  • 10,250 LF of 20” and 8” Water Main and Fire Lines
  • 27,000 LF of Elec. Site Lighting Conduit with Poles & Bases
  • 3,000 LF of Misc. Sleeves for future pipe installations

Related Projects

PENNSYLVANIA CONVENTION CENTER ROOF

PENNSYLVANIA CONVENTION CENTER ROOF

BORGATA AND WATER CLUB HTHW

BORGATA AND WATER CLUB HTHW

PENNSYLVANIA CONVENTION CENTER

PENNSYLVANIA CONVENTION CENTER

BORGATA NORTH TOWER SITE WORK

BORGATA NORTH TOWER SITE WORK