JINGOLI has been performing work at Oyster Creek Nuclear Generating Station since 2003. Many of the larger projects involved total Security Installations and subsequent Security Upgrades, while others involved critical pipe repairs and installations, and still others involved interior building renovations. Work was performed in the Control Room and Radiological Areas, all under strict conformance of all Nuclear Safety Regulations.
Summary of work completed ranged from:
- Intake and Discharge Tunnel debris removal, rehabilitation and modification
- Surveillance System Installations; cameras, poles, electrical and signage
- Emergency Service Water Intake Modifications
- New Vehicle Barrier System installation and Gates
- Demolition of walls and concrete barriers, tree and debris removals, regrading, and site work
- Underground Tank removals and Modifications
- Survey and field support for ISFSI HSMs
- Electrical Work inside Major Buildings and Outfitting two Trailers with Fukushima Communications equipment
- Interior renovation work associated with prior roof leaks, bathroom, shower and locker room upgrades, lighting, furniture and
flooring, office upgrades, and building maintenance - Underground Utility Repair Work; 20” ESW Lines, 12’’ Steam Lines, Fire Mains, and major excavations requiring engineering
shoring systems - Flex Storage Installation; electrical work, concrete pads, barriers, site work and grading
- Man Cage Installation
- ISFSI Pad Construction
- Feed Pump Replacement
- Fire Prevention
- Paving / Road Repairs
- I. S. F. S. I. Utility Relocation
- I & C Shop Renovations
- Maintenance Shop Renovations
- Security Office Building
- OCAB NRC Offices
- Oyster Creek Firing Range
- Oyster Creek DBT Security Upgrade
- Condensate Prefilter Installation