Home About Us Capabilities Portfolio Values Subsidiaries Contact
      

CORRECTIONAL


EDUCATIONAL

HEALTH CARE
INDUSTRIAL

MAJOR FACILITIES

NUCLEAR

POWER

  ACUA LANDFILL GAS TO
  ENERGY PROJECT


  BURLINGTON COUNTY
  PROJECT


  DCO ESSEX COUNTY
  COMBINED HEAT & POWER


  FAIRLESS ENERGY POWER
  PLANT & SUBSTATION


  LINDEN VFT FACILITY

  LVE CENTRAL ENERGY
  CENTER AT ECHELON


  MARINA THERMAL FACILITY
  AND EXPANSION


  PPL MONTOUR PIPELINE


  SALEM COUNTIES UTILITIES
  AUTHORITY PROJECT


  WARREN COUNTY DISTRICT
  LANDFILL


RETAIL



 
PPL Montour Pipeline
 
PPL Montour Pipeline
Montour & Northumberland
Counties, PA

ROLE: Prime Contractor

COMPLETION: June, 2007


  In the spring of 2006 Pennsylvania Power & Light decided to install a 24–inch diameter HDPE pipeline from their Montour Power Plant facility to the Susquehanna River.

Joseph Jingoli and Son, Inc. was awarded the contract to install the 12-mile long pipeline. The pipeline stretches through two counties and many different types of terrain.

Several installation methods and techniques will be used to install the pipeline through 26 stream crossings, 3 railroad crossings, and 10 state road crossings. In addition to the complexities presented by the different crossings, Jingoli Construction will install the pipeline through wetlands, farmland, and small towns. The pipeline terminates in the Susquehanna River where Jingoli Construction will install nearly 100–feet of the special diffuser pipeline in a trench through the river bottom.