Oyster Creek Pre Filter
 
Oyster Creek
Pre-Filter Project
Forked River, NJ

ROLE: Prime Contractor

COMPLETION: September, 2007


  The project consisted of the installation of a state-of-the-art condensate pre-filter for Oyster Creek Nuclear Station. The scope also included the installation of a structural steel grid to support the filter vessels, supply and installation of all connecting piping, hangers, electrical connections, and a monorail crane system for disassembly. Large bore piping spools and valves up to 24” were rigged into place and welded. Tubing for instrument lines and valve actuation was installed. After installation and functional testing, the scope also includes the disassembly of the vessels, installation of a proprietary filter media, and reassembly.

All work was performed inside the Turbine Building, under strict procedures, in a Radiologically Controlled Area.