Home About Us Capabilities Portfolio Values Subsidiaries Contact
      

CORRECTIONAL


EDUCATIONAL

HEALTH CARE
INDUSTRIAL

MAJOR FACILITIES

NUCLEAR

POWER

RETAIL

  MEADOWLANDS XANADU

  PITTSBURGH MILLS

  THE SHOPS AT RIVERSIDE





 
Meadowlands Xanadu
 
Meadowlands Xanadu
Meadowlands Sports Complex
East Rutherford, NJ

ROLE: Prime Contractor

COMPLETION: December, 2008


  Meadowlands Xanadu will be a mixed-use development featuring a 4.76 million square foot entertainment and retail center, 1.5 million square feet of office space, a hotel, and a transportation facility.

This project is adjacent to the Continental Airlines Arena at the Meadowlands Sports Complex. The entire project involves extensive phasing and sequencing to advance construction on a fast track schedule without interfering with the ongoing operation of the sports complex.

SITE WORK
The project consists of earthwork, piles and foundations, storm water infrastructure, sanitary sewer, water distribution system electrical duct bank, roadways, paving, site lighting, and landscaping. JJS is also responsible for all phasing and staging of work zones and maintaining access to the sports complex during construction.

SITE WORK HIGHLIGHTS

  • 150,000 CY of Wetlands Fill

  • 75,000 CY of Surcharge Placement and removal including wick drains and settlement instrumentation

  • 5,700 150 Ton Pipe Piles

  • 630 Pile Caps

  • 73,000 LF of Grade Beams

  • 44,500 SY of Structural Slab

  • 31,000 LF of Storm Sewers ranging in size from 15” to 60”

  • 16,000 LF of Sanitary Sewers (gravity)

  • 0.80 MGD Sanitary Pump Station

  • 4,200 LF of Sanitary Force Main

  • 14,500 LF of Water Main

  • 18,600 LF of Electric Distribution Duct Bank

  • 60,000 LF of Concrete Curb

  • 60 Acres of Asphalt Paving for Roadways and on grade parking

  • 6 Traffic Signals

PARKING DECKS

JJS is the General Contractor constructing two precast concrete parking decks for the entertainment and retail center. Both pile supported decks are two levels and combined will provide 1900 elevated spaces.

OFFSITE HIGHWAY IMPROVEMENTS

JJS is the Construction Manager for all offsite roadway improvements that will be undertaken directly by the Developer to improve access to the site. The scope of work includes a 2 phase project to modify State Route 120 including a new fly over from Route 3, lane widening, ramp modifications and channelization. The New Jersey Turnpike Exit 18W ramps will also be widened and realigned for full time direct access to the site.