Home About Us Capabilities Portfolio Values Subsidiaries Contact
      

CORRECTIONAL


EDUCATIONAL

HEALTH CARE
INDUSTRIAL

MAJOR FACILITIES

NUCLEAR

POWER

  ACUA LANDFILL GAS TO
  ENERGY PROJECT


  BURLINGTON COUNTY
  PROJECT


  DCO ESSEX COUNTY
  COMBINED HEAT & POWER


  FAIRLESS ENERGY POWER
  PLANT & SUBSTATION


  LINDEN VFT FACILITY

  LVE CENTRAL ENERGY
  CENTER AT ECHELON


  MARINA THERMAL FACILITY
  AND EXPANSION


  PPL MONTOUR PIPELINE


  SALEM COUNTIES UTILITIES
  AUTHORITY PROJECT


  WARREN COUNTY DISTRICT
  LANDFILL


RETAIL



 
Linden VFT
 
Linden VFT Facility
Linden, NJ

ROLE: Prime Contractor - Design/Build

COMPLETION: August, 2009


  The project consists of the design/build of a Variable Frequency Transformer Facility that will transform 300 MW of electrical power from the 230,000 volt substation in Linden, NJ to 345,000 volt power required for New York City. The power will be transmitted through an existing underground cable from the Linden Cogen Facility. The scope includes the excavation of approximately 30,000 cy of existing soils, backfill with structural aggregate, installation of 325 piles, design and construction of a new three-story structure housing the VFT and auxiliary equipment, stormwater and oily water separator systems, fire protection systems, installation of all equipment and electrical components, and the installation of a 100 ton gantry crane on the roof of the facility.